Eight plants, 2,800 custom programs, and HAZMAT compliance exposure that legacy warehouse management could not address. VYNQOR executed a brownfield conversion that preserved configuration while remediating the debt underneath it.

Industry
Specialty Chemicals
Region
North America
Duration
18 months
Scale
8 manufacturing sites
The Business Context

In regulated manufacturing, the cost of a compliance gap is not measured in efficiency.

This Fortune 500 specialty chemicals company had operated SAP ECC 6.0 (EhP6) across eight US manufacturing sites since 2006. The landscape carried more than 2,800 custom Z-programs, and batch manufacturing had no SAP-native traceability - compliance was being achieved through costly bolt-ons and extensive manual audit documentation.

The regulatory context made this materially different from a standard ERP modernisation. FDA 21 CFR Part 11 and EPA obligations set an evidentiary standard the existing landscape could only meet through manual effort. Legacy warehouse management could not support HAZMAT inventory requirements, producing audit findings and driving excess safety stock worth over $12M across the eight plants.

Why executives cared
01
Regulatory finding exposure

FDA 21 CFR Part 11 and EPA compliance dependent on manual documentation rather than system-enforced controls.

02
Working capital tied up in risk buffer

Over $12M in excess safety stock held across eight plants because HAZMAT inventory could not be managed with confidence.

03
Upgrade blockade

2,800+ Z-programs represented technical debt that actively blocked system upgrades, compounding the compliance position.

What we found
  • 2,800+ custom Z-programs creating high technical debt and blocking system upgrades.
  • Batch manufacturing lacked SAP-native traceability, requiring custom bolt-ons and manual audit documentation.
  • FDA 21 CFR Part 11 and EPA regulatory compliance impeded by the custom code footprint.
  • Legacy WM module unable to support HAZMAT inventory management, causing audit findings.
  • Excess safety stock worth over $12M held across all eight plants.
Transformation Strategy

How we approached it

Brownfield was the correct choice here - twenty years of regulated process configuration carried real value. The debt underneath it did not.

01

Preserve configuration, remediate code

A system conversion retained validated business configuration - significant in a regulated environment - while custom code was rationalised rather than carried forward wholesale.

02

Move extensions off the core

Z-program rationalisation used SAP BTP side-by-side extensions, relocating necessary customisation outside the core so future upgrades stop being blocked by it.

03

Make compliance system-native

SAP EWM replaced legacy WM to bring HAZMAT inventory management into the platform, converting a manual compliance burden into an enforced system behaviour.

04

Restructure the financial close

Universal Journal activation eliminated manual reconciliation across plant sites, accelerating period-end without adding process overhead.

05

Put analytics in the operator's hands

Embedded analytics with Fiori dashboards surfaced batch manufacturing, quality inspection and plant maintenance KPIs at the point of work.

Solution Architecture

The architecture behind the outcome

A brownfield conversion architecture - validated configuration preserved on the core, customisation deliberately relocated outside it.

Experience & Analytics
At the point of work
SAP Fiori Dashboards
Embedded Analytics
Batch, quality & maintenance KPIs
Extension Layer
Outside the core
SAP BTP Side-by-Side Extensions
Relocated custom logic
Clean Code Remediation
Converted Core
S/4HANA 2023 on-premise
Finance - FI/CO
Supply Chain - MM / SD
Manufacturing - PP / QM
Warehouse & Transport - EWM / TM
Compliance & Traceability
Regulated by design
HAZMAT Inventory Management
Batch Traceability
FDA 21 CFR Part 11 Controls
Universal Journal (ACDOCA)
Business Outcomes

Measured, not estimated.

55%
System performance gain
Post-conversion from ECC to S/4HANA on-premise
40%
Custom Z-program footprint eliminated
5
Days faster year-end financial close
8
Manufacturing sites converted
Recommended Next Measures

Metrics we would instrument next to extend value measurement beyond the delivered baseline. These are recommendations, not achieved results.

  • Audit findings related to HAZMAT inventory control, tracked against the pre-conversion baseline
  • Safety stock value held across sites, as HAZMAT confidence reduces the need for buffer
  • Effort required to produce batch traceability evidence for a regulatory request
Transformation Journey

Delivered through VynImpact™

Every VYNQOR engagement runs on the IMPACT methodology, so delivery health is visible continuously rather than reported retrospectively. This programme ran 18 months end to end.

01
Investigate
Custom code and compliance assessment

Analysed the 2,800+ Z-program estate against regulatory dependency and upgrade impact.

02
Map
Conversion and remediation strategy

Determined what configuration to preserve, what code to eliminate, and what to relocate to BTP.

03
Plan
SAP Activate conversion design

Structured the brownfield conversion path, master data harmonisation and multi-site sequencing.

04
Activate
System conversion and EWM build

Executed conversion to S/4HANA 2023 with EWM replacing legacy WM for HAZMAT compliance.

05
Change & Adopt
Eight-site transition

Rolled out across all eight manufacturing sites with harmonised master data and operator enablement.

06
Track
Performance and compliance measurement

Measured system performance, close duration and custom code footprint against the pre-conversion baseline.

What We Delivered

Scope, grouped by discipline

Platform Engineering

  • Brownfield system conversion to SAP S/4HANA 2023
  • SAP Activate Conversion methodology execution
  • Custom code remediation and rationalisation
  • SAP BTP side-by-side extension architecture

Governance

  • FDA 21 CFR Part 11 control alignment
  • EPA regulatory compliance support
  • SAP-native batch traceability
  • Master data harmonisation across 8 sites

Business Process

  • HAZMAT-compliant inventory management via SAP EWM
  • Batch manufacturing process redesign
  • Quality inspection process alignment

Automation

  • Universal Journal (ACDOCA) activation
  • Elimination of manual financial reconciliation
  • Automated period-end close across plant sites

User Experience

  • SAP Fiori dashboards for batch manufacturing
  • Embedded analytics for quality and plant maintenance
  • Modules deployed: FI/CO, MM, SD, PP, QM, WM, TM
Technology Stack
Core Platform
SAP S/4HANA 2023 (on-premise)SAP Activate Conversion
Extension
SAP BTP Side-by-Side ExtensionsClean Code Remediation
Modules
FI/COMMSDPPQMWM → EWMTM
Experience & Compliance
SAP FioriEmbedded AnalyticsUniversal Journal (ACDOCA)Batch Traceability

Client testimonial pending approval. This engagement is available as a named reference on request.

Reference available on request
Why VYNQOR

What made the difference

We chose the harder conversion path for the right reason

Greenfield would have been faster to build. In a regulated environment, twenty years of validated configuration is an asset - brownfield protected it while still removing the debt.

Customisation relocated, not just reduced

Cutting the Z-program footprint by 40% mattered less than moving what remained onto BTP, so the next upgrade is no longer blocked by the extension layer.

Compliance moved from manual to enforced

EWM brought HAZMAT inventory into the platform. That is the difference between documenting compliance and the system preventing the exception.